Data center demand drives 66% surge in natural gas power plant costs

2026-04-27 · TechCrunch AI · 原文链接

Natural gas power plant costs have nearly doubled in two years and take 23% longer to build as data center electricity demand skyrockets.

热门 AI 工具

Pixlr AIPixlr AI

在线AI照片编辑器

Leonardo.AILeonardo.AI

AI image generation platform for game assets and creative content

CraiyonCraiyon

免费AI图像生成器(前身为DALL-E mini)

DALL-E 3DALL-E 3

OpenAI's latest AI image generator with precise text understanding

ElevenLabsElevenLabs

AI语音生成器,提供逼真的文本转语音

DescriptDescript

一体化视频和播客编辑